SERVICE ยท ADU Construction

ADU Construction & Home Additions in Seattle & the Eastside

Design-build ADU contractor. We handle design, permitting, and construction under one roof, serving the full Seattle metro.

Renovision Design & Build builds accessory dwelling units, backyard cottages, garage conversions, and home additions throughout Seattle, Bellevue, Kirkland, Redmond, Sammamish, Issaquah, and the greater Eastside, with one in-house team managing every phase from permit application to final walkthrough. ADU permitting across King County and Seattle is among the most complex in Washington State. A design-build firm that draws the plans, pulls the permits, and builds the unit is the fastest path from concept to a legal, rentable structure.
Danny adu deck 19 100x100 7eddc3f7

TYPICAL TIMELINE

4โ€“6 weeks

INVESTMENT RANGE

$30k โ€“ $70k+

SCOPE

Design + build

What Is an ADU, and Why Seattle-Area Homeowners Are Building Them

An accessory dwelling unit (ADU) is a self-contained residential unit on a single-family lot, separate from or attached to the primary home. It has its own entrance, kitchen, bathroom, and sleeping area. A detached ADU is also known as a backyard cottage or DADU.

ย 

Washington State passed HB 1337 in 2023, requiring cities and counties in urban growth areas to allow at least two ADUs per single-family lot. Seattle, Bellevue, Kirkland, Redmond, and every other city in our service area now permit ADUs on most residential parcels, opening the door for homeowners who previously thought their lot was too small or their zoning too restrictive.

Rental income

A well-located ADU in the Seattle metro can generate significant monthly rent, and demand from the region's workforce keeps vacancy low in most neighborhoods. Actual rents vary by city, unit size, and finishes, ask us for current comps in your area.

Multigenerational living

A private unit on the same lot, for adult children, aging parents, or in-laws, without buying a second property or giving up shared space in the primary home.

Home value

A permitted, completed ADU is a real asset addition. The exact value it adds depends on your neighborhood and comparable sales, we can walk you through local numbers during a consultation.

Long-term flexibility

Rent it now, use it as a home office or guest suite later. A legal ADU is a permanent asset that serves whatever your life requires at the time.

Types of ADUs We Build

Detached ADU (DADU) / Backyard Cottage

A freestanding structure built in the backyard of the primary lot. This is the highest-value ADU type and provides full privacy between the two units.

  • Square footage: Typically 400 to 1,200 sq ft.
  • State limits: Washington requires cities to allow at least 1,000 sq ft.
  • Local limits: True maximums depend entirely on local lot coverage rules.
  • Typical cost: $180,000 to $320,000+ for turn-key Seattle-area DADUs.
  • Timeline: 12 to 18 months for design, permitting, and construction.
  • Top uses: Rental income, in-law housing, or premium home offices.

Interior ADU Conversion

An interior conversion carves a self-contained unit out of the existing home, most often a large bedroom, an attached garage, or a basement area, with its own exterior entrance added.

  • Square footage: Typically up to 500 sq ft, depending on space and city code.
  • Typical cost: $60,000 to $120,000 depending on the project scope.
  • Timeline: 6 to 10 months from design through completion.
  • Best for: Lower-cost ADU rental income or an attached in-law suite.

Garage Conversion

Converting an existing attached or detached garage into a livable ADU. The existing structure (slab, framing, roof) significantly reduces construction cost versus building new.

  • Square footage: 400 to 700 sq ft (a standard 2-car garage runs 440 to 480 sq ft).
  • Typical cost: $90,000 to $160,000 depending on insulation, HVAC, plumbing, and finishes.
  • Timeline: 8 to 14 months for the conversion process.
  • Best for: Homeowners with an underutilized garage wanting to avoid new construction costs.

Home Addition (Attached Room Addition)

Expanding the existing home's footprint: a new bedroom wing, in-law suite, home office, or family room attached to the current structure. Not technically an ADU (no separate kitchen required), but built under a similar permit process.

  • Square footage: 300 to 1,500 sq ft.
  • Typical cost: $150,000 to $350,000+.
  • Timeline: 10 to 16 months for completion.
  • Best for: Families needing more living space without a fully separate unit.

ADU Permitting Across the Seattle Metro: What You Need to Know

ADU permitting in the greater Seattle area runs through the building department of whichever city you live in, not King County directly. Requirements vary by jurisdiction:

  • City of Seattle: Seattle Department of Construction & Inspections (SDCI). Seattle has some of the most ADU-friendly regulations in the state and has been permitting DADUs at high volume since 2019.
  • City of Bellevue: Bellevue Development Services Center. Strong ADU program, standard King County setback requirements apply.
  • Kirkland, Redmond, Sammamish, Issaquah: Each city has its own building department and permit review cycle. Requirements are similar but not identical: setbacks, lot coverage limits, and fee schedules vary.

ย 

Statewide rules that apply everywhere (HB 1337, effective 2023, with full city compliance required by 2025):

  • Cities and counties in urban growth areas must allow at least two ADUs per single-family lot
  • Owner-occupancy is no longer required. You do not have to live on the property to rent the ADU
  • Cities cannot impose ADU-specific design standards beyond base zoning (no “must match primary home” requirements)
  • Impact fees on an ADU are capped at no more than 50% of what’s charged on the primary home

ย 

Common requirements across all jurisdictions:

  • Building permit plus separate electrical, plumbing, and mechanical permits
  • Site plan showing setback and lot coverage compliance
  • Architectural drawings plus structural engineering (for DADUs)
  • Energy code (WA State Energy Code) compliance documentation
  • Final certificate of occupancy before the unit is legally occupied or rented

ย 

As your licensed general contractor, we pull all permits and manage the full review cycle. Permit liability sits with us, not with you.

Why ADU Projects Need a Design-Build Contractor

A detached ADU requires structural engineering drawings, an energy compliance report, a site plan demonstrating setback and lot coverage compliance, and separate permits for plumbing, electrical, and mechanical. In cities like Seattle, the permit cycle for a DADU regularly runs 10 to 16 weeks, and most first-round submissions come back with comments.

ย 

When your architect and general contractor are different companies, you’re the coordinator between them during the permit cycle. When the reviewer comes back with a comment about the structural connection detail, you’re the one managing the conversation between two firms that are each billing by the hour.

ย 

Renovision’s design-build model puts all of that under one contract:

  • Design: Architectural drawings, structural engineering coordination, and energy compliance documentation, produced by our design team with permit approval in mind
  • Permitting: We submit to the relevant city building department, manage the review cycle, respond to comments, and track status to approval
  • Construction: The same in-house team that drew the plans builds the unit. What we designed is what you get.
  • AI 3D visualization: Before a single permit is filed, you approve a photorealistic 3D render of the finished ADU, exterior appearance, interior layout, and materials. No surprises at framing.

ย 

One contract. One timeline. One point of contact from first conversation to final inspection.

Why ADU Projects Need a Design-Build Contractor

A detached ADU requires structural engineering drawings, an energy compliance report, a site plan demonstrating setback and lot coverage compliance, and separate permits for plumbing, electrical, and mechanical. In cities like Seattle, the permit cycle for a DADU regularly runs 10 to 16 weeks, and most first-round submissions come back with comments.

ย 

When your architect and general contractor are different companies, you’re the coordinator between them during the permit cycle. When the reviewer comes back with a comment about the structural connection detail, you’re the one managing the conversation between two firms that are each billing by the hour.

ย 

One contract. One timeline. One point of contact from first conversation to final inspection.

Free Design Consultation

Architectural drawings, structural engineering coordination, and energy compliance documentation, produced by our design team with permit approval in mind

Permitting

We submit to the relevant city building department, manage the review cycle, respond to comments, and track status to approval

Construction

The same in-house team that drew the plans builds the unit. What we designed is what you get.

AI 3D visualization

Before a single permit is filed, you approve a photorealistic 3D render of the finished ADU, exterior appearance, interior layout, and materials. No surprises at framing.

ADU Construction Projects Across the Seattle Metro

2026 COST GUIDE

ADU Construction Cost in the Seattle Metro

Typical 2026 ADU construction cost ranges in the Seattle metro area
Project Type Typical Range
Interior ADU conversion Existing bedroom or basement, own entrance $60,000โ€“$120,000
Garage conversion $90,000โ€“$160,000
Detached ADU (DADU) New backyard cottage, ground-up $180,000โ€“$320,000+
Home addition Attached, expands existing footprint $150,000โ€“$350,000+

Actual pricing varies based on lot conditions, structural engineering needs, finish level, permitting fees, and utility connections.

These ranges reflect current King County labor and materials costs and should be revisited periodically as pricing shifts. The biggest cost variables are lot slope and soil conditions (steep or soft lots need additional foundation engineering), finish level (standard versus luxury spec), and structural requirements. Permit fees vary by city; Seattle SDCI and Bellevue Development Services both charge based on project valuation, so ask us for a fee estimate specific to your address.

ย 

If you have received ADU bids significantly below these ranges, ask whether the contractor is licensed, pulling all required permits, and providing structural engineering. Unpermitted ADUs cannot be legally rented, complicate home sales, and may require expensive demolition or legalization to remedy.

Not sure where to start?
We'll help you scope it.

What our clients say

SERVICE AREAS

Our ADU Construction Service Area

ADU Construction FAQ

How long does it take to build a detached ADU in Seattle?

The typical timeline for a detached ADU in the Seattle metro area, from initial consultation to final inspection, is 12 to 18 months. Design and structural engineering require 6 to 10 weeks. Permit application preparation and submission take 2 to 4 weeks. City permit review adds 10 to 16 weeks. Seattle SDCI generally has longer review times than Bellevue or Kirkland. Most projects receive at least one round of review comments; first-round approvals are uncommon. Construction takes 16 to 24 weeks after permits are issued. Garage conversions and JADUs are faster, usually completed in 8 to 12 months. The permit phase is the most significant variable. Our design team prepares drawings to achieve approval on the first or second submission, which is the primary way we can influence the timeline.
Yes, once the city issues the final certificate of occupancy (CO), the unit is legally rentable as a long-term residential unit anywhere in the Seattle metro area. Most King County cities do not require an additional landlord license or rental permit for standard residential leases, but please check your specific city for local requirements. Short-term rentals, such as Airbnb or VRBO, are regulated differently. Seattle, Bellevue, and most Eastside cities require a separate short-term rental license, limit the number of rental nights, and may require owner-occupancy of the primary home. We build to the CO. After that, how you use the unit is your decision, but we recommend confirming short-term rental regulations with your city before planning for that income.
No. Washington State HB 1337, signed in 2023 and effective January 2024, removed the owner-occupancy requirement for ADUs statewide. You do not need to live in the primary home to build or rent an ADU, or to rent both units at the same time. This policy change allows ADUs to be used as investment properties. You may purchase a single-family lot, build a DADU, and rent both the primary home and the ADU without residing on-site. All cities in our service area must comply with this law. If a contractor or city permit office provides different information, it is outdated.
A detached ADU renting for $2,200 per month in the Seattle metro area generates $26,400 in annual gross rental income. With a build cost of $220,000, the gross payback period is approximately 8.3 years, not including the typical appraised value increase of $150,000 to $280,000 for a permitted DADU in this market. Most homeowners view rental income as the primary return, considering the value increase as an added benefit. Seattle-area ADU vacancy rates remain below 5%, supported by a strong tech workforce and limited rental supply. A garage conversion costing $110,000 and renting for $1,800 per month achieves payback in about 5 years. These are actual 2026 market figures, verified using current Zillow rental comparisons and Redfin sales data for ADU-equipped properties in King County.
Yes, and many of the best ADU sites in Seattle and the Eastside are on sloped lots. Building on a slope increases foundation costs, which may include stepped footings, grade beams, or a daylight basement, depending on the grade. A geotechnical report is typically required when the slope exceeds 15 to 20 percent. Seattle SDCI and most Eastside cities require this report for slopes in that range. The geotechnical assessment adds 4 to 6 weeks and $3,000 to $6,000 to the project cost. However, sloped lots often allow for a DADU with a lower level that opens to grade, resulting in a walkout unit with better natural light and privacy than a flat-lot backyard cottage. During our free site consultation, we evaluate slope, sun orientation, utility access, and neighbor sightlines, and incorporate these factors into the design before submitting any permit applications.

Get a Free ADU Consultation

We will walk your property, assess your lot for ADU eligibility, and present a 3D concept of the finished unit before you commit to a budget.
ย 
Logo

Your Dream Bathroom in Two Weeks

G1
Yelp logo yelp icon transparent free png
Houzz Logo
BuildZoom Logo
Thumbtack logo black RGB

Fill in your details to get your FREE bathroom estimate & design consultation today.