SERVICE ยท NEW CONSTRUCTION

New Home Construction in Seattle & Bellevue

Ground-up custom homes designed in 3D, permitted correctly, and built by one in-house team from broken ground to final walkthrough.

Renovision Design & Build constructs custom homes throughout Seattle, Bellevue, Kirkland, Redmond, Sammamish, Issaquah, and the greater Eastside. We manage design, permitting, and construction under a single contract, eliminating the need for an architect-to-builder handoff. Our in-house crews oversee every phase, from site work to framing, systems, and finishing, ensuring that the team that designs your home also builds it.

Custom new home construction in Seattle, Bellevue & the Eastside

TYPICAL TIMELINE

24-96 weeks

INVESTMENT RANGE

$200k โ€“ $5000k+

SCOPE

Design + build

Why Build New Homes With Renovision

Custom home projects often face challenges not due to individual trades, but because of poor coordination among architects, builders, and subcontractors who have not previously worked together. Delays and change orders typically result from miscommunication between these parties, rather than from inadequate workmanship.
ย 
Renovision addresses this coordination gap.

Design-Build: One Contract, One Team

With Renovision, your architect, designer, and builder are all part of one team. This eliminates the need to renegotiate scope if issues arise and removes delays caused by third-party conflicts between plans and actual site conditions.

AI 3D Design Visualization

Visualize your completed home (including layout, exterior massing, materials, and lighting) before construction begins. Identifying layout or sightline issues early in the design phase is far more cost-effective than addressing them after construction has started.

In-House Crews - Zero Subcontractors

Typically, site work, framing, electrical, plumbing, and finish carpentry involve multiple separate companies. With Renovision, all work is managed by one team, following a unified schedule and providing a single point of accountability throughout the project.

Permit-Ready From Day One

New construction projects require the most extensive permitting, including building, electrical, plumbing, mechanical, and often land-use or site-development reviews. We include all necessary permits in the project plan before finalizing the design.

New Construction Home Services We Offer

We offer comprehensive new construction services throughout the Seattle metro area, ranging from single-lot custom homes to complete teardown and rebuild projects.

Custom home design and build

Complete ground-up construction on your lot, from foundation to move-in.

Teardown and rebuild

Demolition of the existing structure followed by new construction on the same site.

Lot development and site planning

Grading, utility installation, and site preparation prior to vertical construction.

Architectural design and AI 3D rendering

Photorealistic visualization of the finished home before construction begins.

Structural engineering coordination

Foundation, framing, and load calculations managed through our design-build process.

Permit and code navigation

Building, electrical, plumbing, mechanical, and land-use permits managed across King County jurisdictions.

Systems installation

Electrical, plumbing, HVAC, and low-voltage wiring integrated from the outset, avoiding retrofitting.

Final finish and fixtures

Flooring, cabinetry, countertops, and trim completed by the same in-house crew responsible for framing.

Lighting redesign

recessed, under-cabinet LED, statement pendants over island

Plumbing relocations

sink moves, additional prep sinks, pot fillers

What's included

What Permits Does New Home Construction Require in the Seattle Area?

New home construction involves more permitting requirements than any other project type we handle. The following are the key requirements across Seattle-area jurisdictions:
  • Building permit: Required for any new structure or complete rebuild. A plan review ensures the design meets local building codes before construction begins.
  • Land-use / site-development review: grading, drainage, and setback compliance, particularly on sloped lots or lots near critical areas (streams, wetlands, steep-slope zones common on the Eastside)
  • Electrical, plumbing, and mechanical permits: Separate permits and inspections are required for each system. These are coordinated throughout the construction process rather than obtained all at once.
  • Structural engineering review: Required for foundation and framing calculations, particularly for custom designs that do not follow a standard prescriptive plan.
  • Certificate of occupancy: The final approval confirming the home meets code requirements before it can be legally occupied.
ย 
New construction timelines depend as much on permit review cycles as on the physical build. King County and city building departments may take several weeks or months to review plans, depending on lot complexity and current workload. We include realistic permit timelines in your proposal from the outset, rather than promising a schedule we cannot control once your plans are under review.

Our 4-Phase Kitchen Remodel Process

Consultation, Site Assessment & Design

We start with a free consultation to discuss your budget, goals, and intended use of the home. Our team then assesses the lot or existing structure and identifies any site constraints, such as slope, setbacks, utility access, and teardown needs.

We then develop a photorealistic 3D design that illustrates the proposed floor plan, exterior massing, and material selections. You review and approve the design before we proceed to engineering and permitting.

Proposal, Engineering & Permits

After design approval, we provide a detailed, line-item proposal outlining costs for site work, permits, foundation, framing, mechanical systems, and finishes. Each cost is itemized for full transparency.

We coordinate structural engineering and obtain all necessary building, electrical, plumbing, mechanical, land-use, and site-development permits. Our team manages the permitting process and communicates directly with relevant departments.

Construction & Project Management

Construction starts with site preparation and foundation work, followed by framing, mechanical rough-ins, insulation, drywall, and finish installation.

Your dedicated project manager oversees each stage, coordinates subcontractors and inspections, and provides weekly progress updates. You remain informed throughout the build, with clear visibility into completed work, upcoming milestones, and any decisions requiring your input.

Final Inspections, Walkthrough & Handover

As construction concludes, we coordinate final inspections and address any remaining details. We then conduct a walkthrough with you to review the finished home and confirm it meets the approved plans and project standards.

Once the building department issues the certificate of occupancy, we complete the final handover, ensuring your new home is ready for move-in.

Construction Costs

New Home Construction Cost in Seattle & the Eastside

Typical 2026 pricing for design-build custom home construction
in Seattle and Eastside communities. Land acquisition is not included.

Typical 2026 new home construction cost ranges in Seattle and the Eastside
Project Type Typical Cost Range
Custom home construction Eastside luxury market, priced per square foot $400โ€“$700+ per sq ft
Mid-size custom home Approximately 2,500โ€“3,500 sq ft, land not included $1.2Mโ€“$2.2M+
Teardown and rebuild Existing structure demolition and new construction $1.4Mโ€“$2.5M+
Site work and lot preparation Grading, excavation, utility access and preparation $40,000โ€“$150,000+

These figures reflect typical 2026 Eastside Washington labor and material costs for a design-build custom home and exclude land acquisition. Final pricing depends on slope, soil conditions, utility access, architectural complexity, finish selections, engineering requirements and permitting conditions. Our consultation includes a line-item estimate so you can understand what is driving the project cost before making a commitment.

Not sure where to start?
We'll help you scope it.

What our clients say

SERVICE AREAS

Seattle Metro New Construction Service Areas

We build new custom homes throughout the greater Seattle area

New Home Construction FAQ

How much does it cost to build a new custom home in Bellevue or Seattle?

In the Eastside luxury market, custom new construction typically costs $400 to $700 or more per square foot. This places a mid-size 2,500 to 3,500 square foot home in the $1.2 million to $2.2 million range before land. Final costs depend on lot conditions, architectural details, and finish selections. Teardown-and-rebuild projects include demolition and site remediation, usually totaling $1.4 million to $2.5 million or more. During your consultation, we provide a detailed line-item estimate for site work, permits, structure, and finishes, so you can clearly see what drives your total cost.

The process often takes longer than most homeowners anticipate. The permit review cycle alone may require several weeks to months, depending on your jurisdiction and lot complexity, before construction can begin. After permits are approved, custom home construction typically takes 10 to 16 months or more, based on the home’s size, site conditions, and finish complexity. We provide a realistic timeline in your proposal that separates permit review from construction, ensuring you have a clear understanding of each phase.

At minimum, you will need a building permit, as well as separate electrical, plumbing, and mechanical permits. In most cases, a land-use or site-development review is also required, which is especially important for Eastside lots with slope, drainage issues, or proximity to critical areas such as streams or wetlands. Custom designs that do not follow a standard prescriptive plan require structural engineering review of the foundation and framing. As your licensed general contractor, we obtain all necessary permits and coordinate engineering reviews, so you do not need to manage permit liability.

The decision depends on your existing structureโ€™s condition, your lotโ€™s zoning and setback requirements, and your goals. A teardown and rebuild is appropriate when the current homeโ€™s footprint, systems, or structure cannot reasonably support your desired changes, such as adding a full second story, reconfiguring the layout, or updating all systems to current codes. A major remodel is suitable if the structure and foundation are sound and your plans fit within them. During our free consultation, we assess your property and provide honest recommendations based on your lot and objectives, rather than defaulting to a larger project.

We offer custom, design-build new construction on your lot. You provide the site, or we can help you evaluate potential lots. Our team manages the entire process, from design to construction, under a single contract. Unlike spec-home developers, we do not sell pre-built inventory. Each project is tailored to the homeownerโ€™s needs.

Get a Free New Construction Consultation

We’ll assess your lot, talk through budget range and timeline, and show you a 3D concept of your new home before you commit.
Logo

Your Dream Bathroom in Two Weeks

G1
Yelp logo yelp icon transparent free png
Houzz Logo
BuildZoom Logo
Thumbtack logo black RGB

Fill in your details to get your FREE bathroom estimate & design consultation today.