Home / Services / Kitchen remodeling
Bellevue & the Eastside · Design-build kitchen contractor
From a cabinet-and-counter refresh to a full gut with a new layout, we design your kitchen in 3D, pull the permit and build it with our own crew, for one fixed price.
In-house crews · Licensed, bonded & insured in WA · Permits handled for you
Kitchen remodel at a glance
Typical cost
$45k – $150k+
Build time
8–18 weeks
Permit review
3–6 weeks
Design
3D before you sign
Licensed
Bonded & insured in WA
In-house
Crews for the core trades
3D design
See it before we build it
Permits
Filed and managed by us
The short answer
A kitchen remodel on the Eastside usually costs $45,000 to $150,000 and takes 8 to 18 weeks of construction, plus 3 to 6 weeks for the city permit. A refresh that keeps your layout runs $45k–$75k, a full gut $75k–$120k, and moving walls or plumbing puts most projects at $100k–$150k. Renovision designs, permits and builds the whole job under one contract.
Reviewed by John, project lead · Prices from our 2025–26 Eastside kitchen projects · Updated October 2026
Types of kitchen remodels
Typical Eastside ranges including design, permits and construction. Each type has its own page with scope, timeline and FAQs.
New cabinets or fronts, counters, backsplash and lighting in the same layout.
$45k – $75k
8–12 weeks
Kitchen refresh →
Down to the studs: new wiring, plumbing, insulation, cabinets and finishes.
$75k – $120k
12–18 weeks
Full gut remodel →
Remove a wall, move the sink or range, add an island. Structural permit.
$100k – $150k
12–18 weeks
Layout change →
Built-to-fit cabinetry, pantry walls and islands, designed in 3D before anything is cut.
Priced per scope
6–10 weeks lead
Custom cabinets →
Pro-grade appliances, stone slabs, custom millwork and lighting design for a chef's kitchen.
$150k – $250k+
14–20 weeks
Luxury kitchens →
Measured drawings, 3D renders and a fixed build price, so you see the kitchen before you sign.
Credited to your build
2–4 weeks
Design services →
Kitchen remodeling on the Eastside
One team handles the whole job: measuring, 3D design, permits, demolition, plumbing, electrical, cabinets, counters, tile, lighting and the final inspection. You get one fixed price before work starts and one project lead from the first visit to the final walkthrough.
Most Eastside kitchens we remodel were built between the 1970s and the 2000s, and they share the same problems: closed-off galley layouts, undersized electrical panels, soffits hiding ductwork, and islands too small to work at. We plan for those up front, so the price doesn't change halfway through.
When the designer and the builder are the same company, the drawings are priced as they're drawn. You never pay for a design you can't afford to build, and change orders drop because the crew helped plan the job.
✓
Fixed price before demolition starts
✓
3D renders of your new kitchen
✓
Permits filed and inspections handled
✓
One project lead, weekly updates
✓
Licensed, bonded and insured in Washington
Plan your kitchen
Refresh · same layout · 8–12 wks
Full gut · all new · 12–18 wks
Open concept · wall out · 12–18 wks
Luxury · pro appliances · 14–20 wks
Quartz and quartzite counters
Shaker, slab or inset cabinets
Induction and gas ranges
Layered and under-cabinet lighting
How it works
01
Week 1
We visit, measure, talk through budget and check what's behind the walls.
02
Weeks 2–4
Layout, cabinets and finishes in 3D, with one fixed price you approve before we start.
03
Weeks 3–6
We file permits and order cabinets and long-lead items early, so the build never waits on parts.
04
Weeks 6–16
Demolition, rough-in, inspections, cabinets, counters, tile and paint. We can set up a temporary kitchen so you keep cooking.
05
Final week
Final inspection, punch list and a written warranty on our work.
Typical kitchen projects
Refresh
New shaker cabinets, quartz counters, tile backsplash, LED lighting and a new sink, all in the existing footprint.
$45k – $75k
8–12 weeks
Full gut
New electrical panel circuits, plumbing, flooring, custom-height cabinets, a working island and new appliances.
$75k – $120k
12–18 weeks
Open concept
Structural beam, engineer's letter, relocated plumbing and a large island that becomes the center of the house.
$100k – $150k
12–18 weeks
Reviews
Real Google reviews from homeowners in Bellevue, Kirkland, Redmond and nearby cities who remodeled with Renovision.
Kitchen remodeling FAQ
Straight answers from our project leads. Don't see your question? Call (425) 276-6501.
How much does a kitchen remodel cost in Bellevue and the Eastside?
Most of our Eastside kitchen remodels cost $45,000 to $150,000. A same-layout refresh runs $45,000–$75,000, a full gut $75,000–$120,000, a layout change $100,000–$150,000, and luxury kitchens $150,000–$250,000 or more. Moving a wall or plumbing usually adds $15,000–$30,000.
How long does a kitchen remodel take?
Construction takes 8–12 weeks when the layout stays the same and 12–18 weeks for a full gut or layout change. Add 2–6 weeks before construction for design and permits, depending on your city.
Do I need a permit to remodel my kitchen?
Yes, if you change electrical, plumbing, gas or walls, which almost every kitchen remodel does. Cosmetic work like cabinet fronts or paint usually doesn't. We prepare the drawings, file the permit and meet the inspector for you.
Can I live at home during a kitchen remodel?
Yes, most clients do. We seal off the work area with dust barriers and can set up a temporary kitchen with your fridge, a microwave and a sink so you can keep cooking.
Does a kitchen remodel add value to my home?
Typically, yes. A minor kitchen remodel recoups about 75–85% of its cost at resale, and a major remodel about 55–65%. The bigger return is daily use: more storage, better light and a layout that works.
Why choose design-build instead of hiring a designer and a contractor separately?
With design-build, the same team designs and prices your kitchen, so the plan matches your budget from the start. You get one contract, one point of contact and fewer change orders.
What's included in your kitchen remodel price?
Design and 3D renders, permits, demolition, plumbing, electrical, cabinets, counters, tile, flooring, lighting, paint, installation of appliances and cleanup. Appliance and fixture allowances are listed line by line in your fixed price.
Start your kitchen remodel
Tell us about your kitchen. We'll visit, measure, and talk through layout, finishes and budget, then send you a fixed price.
Renovision Design & Build LLC
1400 112th Ave NE, Bellevue, WA 98004
(425) 276-6501 · Mon–Fri 8–5
Kitchen remodeling near you
We never share your details.